Data Center, MN

Data Center, MN
Date: 4 May 2026

The contractor, Parsons Electric, was working on installing an underground electrical duct banking system that would lead conduit to a 53,000 square foot building that will include offices, training spaces, and a data center. The contractor was looking for an anchoring solution to help prevent the PVC conduit from floating when concrete was poured.

In searching for a solution, Parsons Electric found that the Gripple Duct Bank Anchoring System offered full protection against all upward forces. Parsons Electric have used Gripple hanger products before but this was their first time utilizing the Duct Bank Anchoring system. In addition to the anchor’s strength, their ground’s engineering properties were able to be accessed with minimal soil disturbance which maintained the strength of the trench walls. Using Gripple over the traditional method on this project was five times faster and saved the contractors 12.7 hours of total installation time.

Our standard installation for one anchor on the duct bank took us 8 to 9 minutes. With the Gripple anchor it takes us about a minute and a half to 2 minutes. We are moving to make this our standard for duct bank anchoring.
– Parsons Electric