St. Thomas Elgin General Hospital, Ontario

St. Thomas Hospital in Ontario, Canada is a new construction hospital completed at the start of 2018.

St. Thomas Elgin General Hospital, Ontario
Date: 3 September 2020
  • Building Type: Hospital
  • Contractor: Besterd Mechanical 
  • Services: Pipework/Plumbing

Gripple Seismic Restraints and Vibration Isolators were used during this project to brace and stabilise mechanical plumbing and medical gas piping. These Gripple products were used in place of the more traditional and less efficient method of using threaded rod, strut and rigid bracing. Gripple products allowed for a one man crew to install, whereas traditional rod stiffening would have taken a crew of three men. With no on-site cutting, Gripple products were safer and produced less waste than the traditional cutting of threaded rod and strut. The contractor on this project, Joe Kelly, had never used Gripple products prior to this project. Joe Kelly stated, “I found it to be fast and easy, simple and versatile”.

“I found Gripple to be really easy to install, with a short learning curve. Once I became familiar with the installation I found it to be fast and easy, simple and versatile. I look forward to using Gripple solutions again”.
Joe Kelly